Plant construction work: why hire an RBQ-licensed contractor
What the law says, what the licence bond covers, the 2026 fines, and the very real risks of hiring someone without a licence.
Read the article →
RBQ licenceQuebec building authority
Electromechanics, TIG welding and custom fabrication for the food processing, pharmaceutical and chemical industries, aluminum smelters, steel mills and rail. Across Quebec, elsewhere in Canada and in parts of the United States.

Conveyors, mixers, ovens and proofers for bakeries and processing plants.
Food-grade stainlessSector guide: shutdowns, maintenance, welding, permits →
Careful fabrication and welding for controlled environments.
Sanitary TIG weldingSector guide: shutdowns, maintenance, welding, permits →
Heat exchangers, cyclones, platforms, ladders and guardrails.
Preventive and corrective maintenanceSector guide: shutdowns, maintenance, welding, permits →
Mechanical maintenance, repair welding and parts fabrication for heavy equipment.
Heavy equipmentSector guide: shutdowns, maintenance, welding, permits →
Mechanical maintenance, welding and fabrication for rail shops and yards.
On-site serviceSector guide: shutdowns, maintenance, welding, permits →Alliance Maintenance Industrielle specializes in electromechanical maintenance and custom metal fabrication, mainly for the chemical, food processing and pharmaceutical industries.
A.M.I specializes in industrial mechanics, custom fabrication for the food and pharmaceutical industries, and the integration of production equipment into existing lines.
Alliance Maintenance Industrielle has built a solid reputation with its clients for preventive and corrective maintenance of industrial production lines, American and European equipment, and periodic shutdown maintenance.
An effective program for equipment maintenance and for fabricating and reproducing parts is essential, and it plays an intrinsic role in Lean Manufacturing performance. Equipment maintenance can be seen as health care for machinery and manufacturing equipment.
A.M.I, a leader in electromechanical maintenance and in industrial, food processing and pharmaceutical metal fabrication, serves all of Quebec, several regions across Canada and selected destinations in the United States.
We offer a full range of electromechanical, welding and custom fabrication services, including machining, mechanical fabrication, industrial welding, electromechanical services, repair and maintenance of parts and equipment, and the design and fabrication of custom projects. Our industrial mechanics and welding shop in Quebec is equipped with the latest technology to ensure reliable and efficient service.
Our industrial mechanics company has more than 20 years of experience in the field, with recognized know-how in Quebec and across Canada. Our Licence C technicians are certified and experienced, which allows us to deliver high-quality services that meet the highest standards. We are proud of our turnkey approach, which lets us handle every aspect of your projects, from design to installation.
Our clients’ safety and satisfaction are our top priority. We do everything we can to ensure our work is carried out with the utmost attention to machine safety and occupational health and safety standards. We work closely with our clients to understand their needs and offer tailored solutions that meet their expectations. Our goal is to deliver services that exceed our clients’ expectations and contribute to their growth and success.
We can fabricate and repair a wide range of industrial machines and equipment, including heat exchangers, cyclones, mixers, ovens, proofers, specialized carts, and complex platforms, ladders and guardrails. Our shop is equipped with the latest technology, which allows us to work with precision and efficiency. We also specialize in bending and welding metal parts and in installing industrial machinery.
Tap a category to see our work.
Short articles that answer the questions plant managers ask us most often.

What the law says, what the licence bond covers, the 2026 fines, and the very real risks of hiring someone without a licence.
Read the article →
Why a polished surface and continuous welds, with no cracks or crevices, protect your products from bacteria and pests. With standards and numbers.
Read the article →
How a curb wall at the base of your walls extends the life of the building, keeps the plant clean and good-looking, and prevents costly repairs.
Read the article →
Low-hydrogen electrodes, baking, preheat, statically or cyclically loaded structures: the essentials of CSA W47.1 and W59 in simple tables.
Read the article →
What to settle two weeks before the shutdown so everything runs smoothly on the day.
Read the article →
What changes between the two grades, and when the price difference is worth it.
Read the article →
The noises, vibrations and wear that warn of a breakdown before it happens.
Read the article →Alliance Maintenance Industrielle is a proud partner of Flow Oversight and a supplier of the Factory Grid and Building Grid maintenance management systems.
Business management with built-in AI: work hours, signed work orders, inventory, employees and payroll.
Discover Flow ↗ Factory GridOversightComputerized maintenance management system (CMMS) for plants.
Discover Factory Grid ↗ Building GridOversightCommercial and institutional maintenance management.
Discover Building Grid ↗Describe the work and attach a photo if you have one. We will reply with a quote.

Low-hydrogen electrodes, baking, preheat, statically or cyclically loaded structures: the essentials of CSA W47.1 and W59, in simple tables.
In Canada, a company that welds steel structures and parts is generally certified by the Canadian Welding Bureau (CWB Group) to CSA W47.1. The fabrication of welded assemblies follows CSA W59. These two standards set precise rules, and a CWB audit verifies that they are applied. Here are the essentials, in plain language.
Important: this summary does not replace the standards. On a job site, the CWB-approved welding procedure (WPS and WPDS) and the project engineer always have the final say.
The standard classifies companies into three divisions, according to the role of the welding engineer.
| Division | Welding engineer | Welding supervisor |
|---|---|---|
| Division 1 | Full-time engineer on staff | Required |
| Division 2 | Engineer retained part-time | Required |
| Division 3 | Not required | Required |
At Alliance Maintenance Industrielle, our welders are CWB-qualified in SMAW (stick electrode) and FCAW (flux-cored wire).
CSA W59 has a common part (Clauses 1 to 10), followed by two separate parts: Clause 11 for statically loaded structures and Clause 12 for cyclically loaded structures, that is, structures subjected to repeated loads that can cause fatigue. The project engineer determines the type of structure.
| Static (cl. 11) | Cyclic (cl. 12) | |
|---|---|---|
| Common examples | Buildings, mezzanines, platforms, stairs, guardrails | Overhead crane runway beams, vibrating machine supports, bridges, railway equipment |
| Extension bars (run-off tabs) | May remain in place, unless the engineer requires their removal | Removed once welding is complete |
| Steel backing | May remain in place, unless the engineer requires its removal | Removed on welds perpendicular to the load, then the joint is ground smooth |
| Visual inspection | Clause 11 criteria | Clause 12 criteria, stricter because of fatigue |
Simply put: on a part that vibrates or undergoes load cycles, every small defect can become the starting point of a fatigue crack. That is why Clause 12 is more demanding.
The coating of low-hydrogen electrodes absorbs moisture from the air. This moisture brings hydrogen into the weld, which can cause cold cracking (hydrogen cracking): a crack that sometimes appears several hours after welding, often invisible to the naked eye. The risk increases with thickness, steel strength and cold. Keeping electrodes dry and warm is the first line of protection.
Note: in Canada, the E7018 electrode is called E4918 (metric designation under CSA W48).
| Situation | Rule |
|---|---|
| New hermetically sealed box | Usable as is, if the box is not damaged |
| After the box is opened | Store the electrodes in a holding oven at a minimum of 120 °C (250 °F) |
| Out of the oven, E4918 (E7018) | Use within 4 hours |
| Out of the oven, electrodes stronger than E49XX (e.g. E5518, the "8018") | Half the time allowed for E49XX, i.e. 2 hours |
| Time limit exceeded | Re-bake in a rebake oven before use, once only |
| Wet electrode | Discard, never re-bake |
| Electrode | Temperature | Duration |
|---|---|---|
| E4918 / E7018, per AWS D1.1 | 260 to 430 °C (500 to 800 °F) | At least 2 hours |
| E7018, per the manufacturer Lincoln Electric | 340 to 400 °C (650 to 750 °F) | 1 hour |
| E5518 / E8018 and stronger | 370 to 430 °C (700 to 800 °F) | At least 1 hour |
Preheat slows the cooling of the weld and helps hydrogen escape. The table below gives the minimum temperatures for common structural steels (for example 300W, 350W, A36, A572 grade 50). The thickness to consider is that of the thickest part in the joint.
| Thickest part | Low-hydrogen electrode (E4918, FCAW, GMAW) | Non-low-hydrogen electrode (e.g. E4310 / E6010) |
|---|---|---|
| Up to 20 mm (3/4 in.) | No preheat* | No preheat* |
| Over 20 to 38 mm (3/4 to 1 1/2 in.) | 10 °C (50 °F) | 65 °C (150 °F) |
| Over 38 to 65 mm (1 1/2 to 2 1/2 in.) | 65 °C (150 °F) | 110 °C (225 °F) |
| Over 65 mm (2 1/2 in.) | 110 °C (225 °F) | 150 °C (300 °F) |
* Never weld on steel below 0 °C: first warm it to at least 20 °C. Also remove all traces of moisture or frost.
These values come from the minimum preheat table of AWS D1.1 (categories A and B). The Canadian standard CSA W59 has its own table (Table 5.3); for example, it also calls for 10 °C for a 25 mm joint in 350W steel welded with a low-hydrogen electrode. For CWB-certified work, the W59 table and the approved procedure apply.
Do you have a structural welding project or a repair that must meet the standards? Call us at 438-357-8800.
Photo: Unsplash. This article provides general information; it does not replace the manufacturer's requirements or your facility's risk assessment.