Planned shutdown — Rail
How is work organized in a shop or rail yard?
The work follows the carrier's safety rules: safety orientation, track protection and train movements coordinated by the site supervisor. Interprovincial railway companies fall under the Canada Labour Code, Part II: their safety programs apply to our crews in addition to our own procedures.
Preventive maintenance — Rail
Which rail shop equipment do you maintain?
Fixed shop equipment: lifting jacks, overhead cranes, compressors, conveyors, structures, platforms, ladders and guardrails. An inspection schedule limits unplanned shop downtime.
Corrective maintenance — Rail
Can you respond quickly to broken equipment?
Yes. Our 24/7 emergency service (438-357-8800) sends a technician to diagnose, repair on site or fabricate the replacement part in our shop.
Welding — Rail
Which welding standards apply in the rail sector?
Steel structures follow the CSA W59 standard and are welded by welders certified by the Canadian Welding Bureau (CWB). For rolling stock components, the carrier's own standards apply: we obtain and follow them before any work.
Hot work permit — Rail
What specific risks apply to hot work near the tracks?
Railcars may carry dangerous goods, and fuels, greases and treated ties are combustible. The permit specifies the distance from railcars and the products present, in addition to the 15 m clearance and the fire watch.
What does a hot work permit contain?
The location and validity period (no longer than the work shift), a description of the work, the checks made before starting, the name of the fire watch and the signatures. Combustible materials are removed or protected within a 15 m radius. After the work, the fire watch stays in place for at least 1 hour, then the area is checked periodically for at least 4 hours in total. You can download our template below. Also read: industrial maintenance and industrial staffing.
Permit templates to download
Sources
- Canada Labour Code, Part II, and Canada Occupational Health and Safety Regulations (SOR/86-304) — federally regulated undertakings
- CSA W59 — Welded steel construction; CSA W47.1 — Certification of welding companies (Canadian Welding Bureau)
- ASP Construction — Hot work permit (template, 2023)
- NFPA 51B — Standard for Fire Prevention During Welding, Cutting, and Other Hot Work
- CSA W117.2 — Safety in welding, cutting and allied processes
- Règlement sur la santé et la sécurité du travail (Regulation respecting occupational health and safety) (RSST), CQLR c. S-2.1, r. 13 — lockout (ss. 188.1 to 188.13), confined spaces (ss. 297 to 312), fall protection (ss. 33.2, 33.3 and 346 to 354)