Planned shutdown — Aluminum smelters and steel mills
How do you prepare a planned shutdown in a steel mill or aluminum smelter?
The work is coordinated with production and with the furnace or pot schedule. Each piece of equipment has its own energy control procedure: electrical, hydraulic, pneumatic and gravity (suspended loads, counterweights). Overhead cranes are taken out of service and locked out before any work in their path.
Preventive maintenance — Aluminum smelters and steel mills
Which equipment should be maintained first?
Conveyors, gear reducers, hydraulic systems, overhead crane structures and runways, as well as parts exposed to heat and abrasion. Planned replacement costs less than a breakdown in the middle of production.
Corrective maintenance — Aluminum smelters and steel mills
Can a worn or cracked part be repaired rather than replaced?
Often, yes: weld repair or fabrication of a custom replacement part shortens the shutdown when the original part has a long lead time. We assess the part with you before deciding.
Welding — Aluminum smelters and steel mills
Are there special precautions for welding in an aluminum smelter?
Yes. Near electrolysis pots, intense magnetic fields can deflect the welding arc: the method and setup must account for this. Wherever there is molten metal, tools and materials must be completely dry, because moisture in contact with liquid metal can cause an explosion.
Hot work permit — Aluminum smelters and steel mills
Is a hot work permit required in a plant where molten metal is already present?
Yes. Heat in the process does not exempt you from the permit: hydraulic oils, greases, cables and dust remain combustible. Heat stress on workers must also be planned for: breaks, hydration and monitoring.
What does a hot work permit contain?
The location and validity period (no longer than the work shift), a description of the work, the checks made before starting, the name of the fire watch and the signatures. Combustible materials are removed or protected within a 15 m radius. After the work, the fire watch stays in place for at least 1 hour, then the area is checked periodically for at least 4 hours in total. You can download our template below. Learn more: industrial maintenance services and skilled industrial staffing.
Permit templates to download
Sources
- Règlement sur la santé et la sécurité du travail (Regulation respecting occupational health and safety) (RSST), CQLR c. S-2.1, r. 13 — lockout (ss. 188.1 to 188.13), confined spaces (ss. 297 to 312), fall protection (ss. 33.2, 33.3 and 346 to 354)
- APSAM — Lockout and other energy control methods: regulations
- ASP Construction — Hot work permit (template, 2023)
- NFPA 51B — Standard for Fire Prevention During Welding, Cutting, and Other Hot Work
- CSA W117.2 — Safety in welding, cutting and allied processes
- CSA W59 — Welded steel construction; CSA W47.1 — Certification of welding companies (Canadian Welding Bureau)