In an aluminum smelter in Quebec, we installed an industrial sandblaster. Here is the challenge, the solution we chose and the result.
The challenge: 2,400 lb in a tight space
Two parts weighing 1,200 lb each had to be installed on the elevator, in a very tight space. The constraints of the location prevented us from mounting them separately.
In an operating plant, the space around equipment is rarely clear: structural steel, ducts, other machines and traffic aisles all limit the lifting angles.

Our solution: a welded temporary structure
As a CWB-certified company, we designed and welded a temporary structure to support both parts together. It let us lift them in one go and set them in place safely.
A temporary structure keeps both parts aligned during the lift and spreads the load between the lifting points. It is only used for the lift: once the parts are secured in place, it has no further role. This kind of custom piece, designed and welded for a single job, is what makes an otherwise impossible installation possible.


The result
Both parts were lifted and set in place in a single operation, safely. When space is tight, preparation makes all the difference.

Do you have a difficult installation?
Describe the equipment, its weight and the available space with the quote form, or call us at 438-357-8800. We plan the lift and the installation with you.
Photos: Alliance Maintenance Industrielle. The client is not named.