Preventive and corrective maintenance, heat exchangers, cyclones, platforms, ladders and guardrails for chemical plants.

Planned shutdown — Chemical

How do you prepare a maintenance shutdown in a chemical plant?

Before any mechanical work, equipment is drained, purged and decontaminated, and process lines are isolated: valves locked out and, where needed, blind flanges installed. Tanks and reactors are often confined spaces: the RSST (ss. 297 to 312) then requires the hazards and prevention measures to be determined in writing by a qualified person, with an attendant and a rescue plan.

Which documents should be consulted before the work?

The safety data sheets (WHMIS) for the products present, the lockout procedure for each piece of equipment and the facility's permits: hot work, confined space and work at height.

Permit templates to download

Sources

  1. Règlement sur la santé et la sécurité du travail (Regulation respecting occupational health and safety) (RSST), CQLR c. S-2.1, r. 13 — lockout (ss. 188.1 to 188.13), confined spaces (ss. 297 to 312), fall protection (ss. 33.2, 33.3 and 346 to 354)
  2. Décret 43-2023 (Order in Council 43-2023) amending the RSST (confined spaces), Gazette officielle du Québec, January 25, 2023 — in force July 25, 2023
  3. CSA Z1006 — Management of work in confined spaces
  4. APSAM — Lockout and other energy control methods: regulations
  5. ASP Construction — Hot work permit (template, 2023)
  6. Port of Québec — Hot work framework program (references: National Fire Code, NFPA 51B, CSA W117.2)
  7. NFPA 51B — Standard for Fire Prevention During Welding, Cutting, and Other Hot Work
  8. CSA W117.2 — Safety in welding, cutting and allied processes
  9. CSA W59 — Welded steel construction; CSA W47.1 — Certification of welding companies (Canadian Welding Bureau)
  10. Code de sécurité (Safety Code), chapitre VIII — Bâtiment (Chapter VIII — Building), CQLR c. B-1.1, r. 3, which incorporates the National Fire Code — Canada 2010 (amended)